Simultaneously with the relocation of the mold design room, CAM and CAD (2D and 3D) were upgraded to the latest versions.
![](https://seiko-scm.co.jp/wp-content/uploads/2023/05/IMG_2818-2-1024x1024.jpg)
The original mold design room is here.
![](https://seiko-scm.co.jp/wp-content/uploads/2023/05/58db91fd6826d4a33503900d9de472cd-1.jpg)
![](https://seiko-scm.co.jp/wp-content/uploads/2023/05/8b483a41b1d6451aaead1f9ef1b6ad9c.jpg)
![](https://seiko-scm.co.jp/wp-content/uploads/2023/05/IMG_7070-1024x768.jpg)
![](https://seiko-scm.co.jp/wp-content/uploads/2023/05/IMG_7347-1024x768.jpg)
Renovation [mold design office]
/ NewsSimultaneously with the relocation of the mold design room, CAM and CAD (2D and 3D) were upgraded to the latest versions.
The original mold design room is here.