株式会社盛光SCM

  • En
  • Ja
Production request / Factory tour / InterviewetcOnline interview
  • Home
  • Business
    • Product design
    • Sheet Metal
    • Metal mold
    • Production Plant
    • Environmental testing
  • Parts
  • About Us
    • Company Information
    • Greetings
    • Ten Action Guidelines
    • Access
    • News / Blog
  • Case study
  • Contact
  • Home
  • Business
    • - Product design
    • - Sheet Metal
    • - Metal mold
    • - Production Plant
    • - Environmental testing
  • Parts
  • About us
    • - Company Information
    • - Greetings from the President
    • - Ten Action Guidelines
    • - Access
    • - News / Blog
  • Case study
  • Contact
Production request / Factory tour / InterviewetcOnline interviewClick here >>
  • En
  • Ja

News / Blog

  • Home
  • All Blog

All

  • News
  • PROJECT
  • letsgokoba
  • Collaboration case
  • Kusaba's Voice
  • Case study
2015-07-29 / News

After the internship

A student from Fuse Technical High School who completed a three-day internship. He seemed a little nervous because he was the only participant this time, but he worked earnestly until the end. Here are his impressions.  I came to this company because…

2015-07-28 / News

MAKINO vertical machining center is introduced!

A new MAKINO vertical machining center has been installed in the mold and die factory. Everyone watches with excitement as the cool, brand-new machine makes its debut. The color is beautiful. The machine is moved to the designated position by attaching a…

2015-07-27 / News

Renovation [mold factory].

Renovation of the mold shop is underway in preparation for the introduction of new machinery. The site of the former office. We say goodbye to the Morimitsu staff after many years of hard work. They worked hard for many years. Thank you…

2015-07-25 / News

Renovation [mold design office]

Simultaneously with the relocation of the mold design room, CAM and CAD (2D and 3D) were upgraded to the latest versions. The original mold design room is here. The new mold design room is being built on the same floor. The new…

2015-07-24 / News

internship

In order to have young people who are about to enter the workforce understand the joy of manufacturing, we offer internships. We are accepting internship students. Under the guidance of the assembly line leader They experience simple assembly work under the guidance…

2015-07-13 / News

Renovation [General Office]

Layout change of the general office of the Lighting Division. The new organization and department were decided upon, and the new layout was put in place. ↑ up Before the move. It took half a day to redecorate (clean up?) with moving…

2015-07-13 / News

Next Renovation

After the 2nd floor studio, the mold design room was moved in-house. On July 25, a mold machine tool (Makino machining center) was introduced. The staff's ideas and persistence are born from a comfortable environment for them, resulting in good planning and…

2015-07-10 / News

relaxation

Before doing good work, be healthy. To relieve daily fatigue and work comfortably, A massage room has been set up in a part of the 5th floor cafeteria. Lymphatic Healing Place Nakaikui Dr. Koji 6-8 Nishinokyo Kyotsukamoto-cho, Nakagyo-ku, Kyoto 075-821-0678 ■Reservation priority…

Posts pagination

Back 1 … 12 13 14 … 19 Next

株式会社盛光SCM

2-8-25 Kishidadounishi, Higashiosaka City,
Osaka Prefecture 577-0848
TEL.06-6727-2855 FAX.06-6729-0660
Business hours: 8:30-17:30 (Sundays and days specified by our company are closed)
                Privacy Policy

Copyright by SEIKO SCM Co.,Ltd. All rights reserved.