株式会社盛光SCM

  • En
  • Ja
Production request / Factory tour / InterviewetcOnline interview
  • Home
  • Business
    • Product design
    • Sheet Metal
    • Metal mold
    • Production Plant
    • Environmental testing
  • Parts
  • About Us
    • Company Information
    • Greetings
    • Ten Action Guidelines
    • Access
    • News / Blog
  • Case study
  • Contact
  • Home
  • Business
    • - Product design
    • - Sheet Metal
    • - Metal mold
    • - Production Plant
    • - Environmental testing
  • Parts
  • About us
    • - Company Information
    • - Greetings from the President
    • - Ten Action Guidelines
    • - Access
    • - News / Blog
  • Case study
  • Contact
Production request / Factory tour / InterviewetcOnline interviewClick here >>
  • En
  • Ja

News / Blog

  • Home
  • All Blog

All

  • News
  • PROJECT
  • letsgokoba
  • Collaboration case
  • Kusaba's Voice
  • Case study
2015-05-28 / News

Self-build <Furniture assembly

Today is furniture assembly. Five large tables and two small ones. They are being assembled quickly and efficiently. The space for the shelves is also under construction. It will be completed this week. One more step to go!

2015-05-27 / Case study

Published in the June issue of Shoten Kenchiku

SHOTENKENCHIKU June issue features Morimitsu SCM's products. LED spotlights inspired by baguettes line the ceiling of "panscap," a bakery in Fukuoka, Japan. The brass-plated finish leaves an uneven surface to express the burnt appearance of baguettes. LED spotlights in the image of…

2015-05-22 / News

S-JET certified periodic factory survey completed

Yesterday, an S - J ET certified factory survey was conducted and the results closed in conformity.

2015-05-22 / News

Self-build〈Floor painting〉

Today we are applying a clear topcoat. The paint is made of plant oil. The ingredients are safe for children to eat, and the paint is used for building blocks. Tools made by the staff themselves. The base is sturdy. The handle…

2015-05-18 / News

2F self-build <afterwards>.

A little over a month after demolition, the interior of the 2nd floor showroom is being finished. 天井下地塗り・塗装 ↓ Painting of wall surface ↓ Flooring ↓ Fixture installation The process up to this point was completed last weekend. Under the guidance of…

2015-04-15 / News

Euroluce

We have received images of the Euroluce being held. In-house staff, especially those on the assembly team, are very interested in them. We will make use of not only the design but also the fit of the invisible parts in our future…

2015-04-15 / News

Showroom disintegration in progress

With what intention to finish this space? The designer explained to everyone in the company at the morning meeting. The ceiling demolition was finished in no time, thanks to the collaborative play among all departments... The LGS was also removed to create…

no-img
2015-04-07 / News

Self-Build de Renewal

Demolition of the 2nd floor has finally begun. Employees are doing the demolition. We decided to leave the specialized work such as electricity and equipment to professionals and build the parts we could do ourselves. This kind of opportunity is a rare…

Posts pagination

Back 1 … 14 15 16 … 19 Next

株式会社盛光SCM

2-8-25 Kishidadounishi, Higashiosaka City,
Osaka Prefecture 577-0848
TEL.06-6727-2855 FAX.06-6729-0660
Business hours: 8:30-17:30 (Sundays and days specified by our company are closed)
                Privacy Policy

Copyright by SEIKO SCM Co.,Ltd. All rights reserved.